Heating/cooling technology for the Protestant Campus Nuremberg.
The construction project includes the renovation and expansion of the former Oberpostdirektion Nuremberg from the 1970s.
in the northwest of the old town of Nuremberg. The building is not a listed building.
The renovation of the existing building affects all components, the extension is carried out by means of additional storeys above components A
(2 storeys) and C (3 storeys).
Heater:
- approx. 9,000 m black steel pipe, DN 15-DN 125
- approx. 270 pcs radiator steel/aluminium
- 1 pc connection to on-site district heating transfer station
- 1 St Druckhaltstation
- 5 pcs heating manifold, 3-5 circuits
- ca. 200 St Rohrleitungsarmaturen DN 15_DN 125
- approx. 26 pcs Electronic circulating pumps
- approx. 9,500 m2 underfloor heating
- approx. 2,400 air-conditioned ceiling sails (size 1.5 _ 3 m2)
- approx. 13,000 m Cu-Rohrleitungen, 15x1 _ 28x1,5
2 St Türluftschleieranlage
Cold:
- approx. 8,500 m black steel pipe, DN 15-DN 200
- ca. 38 St Umluftkühlgeräte
- 1 pcs chiller, approx. 770 kW
- 3 St Rückkühler
- 1 St Druckhaltstation
- 2 pcs buffer tank
- 1 pcs refrigeration distributor, 8 circuits
- ca. 100 St Rohrleitungsarmaturen DN 15_DN 200
- approx. 15 pcs Electronic circulating pumps