Development of the Sonnenrain residential area BA 3 construction phase 1
Sewer and road construction work, conduit and cable laying work, civil engineering
Utilities
Civil engineering and road construction works (HGE):
Removal, storage and covering of topsoil approx. 3,800m³
Loosen the soil approx. 1.800m³
Improve the soil approx. 3.175m³
Installing the floor approx. 3.600m³
Substrate improvement, mill in binder approx. 3.800m²
Ballast base courses produce approx. 2,900m³
Making street drains approx. 52 pcs.
Asphaltflächen approx. 5,900m²
Making edge edgings approx. 2,760m
Mastfundamente Beleuchtungsmasten ca. 32St
Hauskontrollschächte ca. 25St
Sewer construction work (EB wastewater):
Kanalgrabenaushub ca. 5.700m³
Kanalgrabenverfüllung ca. 3.900m³
Pipe zone (chippings) approx. 900m³
Sewers DN 200 to DN 400 approx. 1,050m
Hausanschlussleitungen DN 160 ca. 200m
Kanalschächte DN 1200 ca. 28St
Stadtwerke Schwäbisch Hall GmbH:
Excavation for supply lines approx. 850m³
Sandverfüllung ca. 420m³
Cable laying approx. 3,750m