Delivery and installation of 66 fire doors in the lobby of Torwar I.
Delivery and assembly of 66 fire doors in the corridors of the Torwar I facility in the Central Sports Center in Warsaw at 6a Łazienkowska Street. The delivery and installation of new doors also includes the filling of gaps (resulting from uneven walls) between the wall and the frame and between the floor and the frame after their installation and includes the disposal of the old door at the expense of the contractor.