1. The subject of the contract is the regeneration of air springs SEK 680-12 and air springs SEK 580-7/8.
2. Regeneration of the subject of the contract consists in performing works aimed at restoring operational parameters in accordance with the construction and technical and operational documentation.
3. Specification of the work relating to the subject matter of the contract:
1) System cleaning/washing,
2) Dismantling of the entire system,
3) Verification of wear of elements and, if necessary, replacement with new ones:
- fixing plate - verification, painting
- foot ring – verification
4) Replacement of elements with new ones:
-Fasteners
- membrane (bellows) – replacement, (delivery of the membrane on the side of the Ordering Party)
- additional spring with sliding plate – replacement,
- sealing elements (O-ring)
5) Reassembling the system,
6) SEK certificate for the next 8 years of operation, certificate 3.2
7) Report on the regeneration carried out, list of dimensions. Parts
1. The subject of the contract is the regeneration of air springs SEK 680-12 and air springs SEK 580-7/8.
2. Regeneration of the subject of the contract consists in performing works aimed at restoring operational parameters in accordance with the construction and technical and operational documentation.
3. Specification of the work relating to the subject matter of the contract:
1) System cleaning/washing,
2) Dismantling of the entire system,
3) Verification of wear of elements and, if necessary, replacement with new ones:
- fixing plate - verification, painting
- foot ring – verification
4) Replacement of elements with new ones:
-Fasteners
- membrane (bellows) – replacement, (delivery of the membrane on the side of the Ordering Party)
- additional spring with sliding plate – replacement,
- sealing elements (O-ring)
5) Reassembling the system,
6) SEK certificate for the next 8 years of operation, certificate 3.2
7) Regeneration report, list of replaced parts.
4. Detailed rules for the implementation of the subject of the contract, payment terms and other relevant requirements have been included in the model contract, which constitutes Annex 4 to the SWZ.
5. The Contracting Authority shall not allow partial or variant bids.