Airport buildings construction work | Tenderlake

Airport buildings construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 April 2022
Closing Date:
06 May 2022
Location(s):
DE21B Freising (DE Germany/DEUTSCHLAND)
Description:
Munich Airport_2021-1003075_Zentralentechnik ELA T2 and GSH

ELA T2 and GSH (baggage sorting hall): Delivery, assembly, commissioning and maintenance of electroacoustic systems in the T2 and GSH area during ongoing terminal operation as a replacement for the existing systems

Replacement of existing ELA in Terminal 2 and baggage sorting hall by setting up a new voice alarm system in accordance with DIN CEN/TS 54-32 and DIN EN 54-16 for alarm and operational announcements.

There are 18 new centres to be set up and put into operation in the baggage sorting hall in the terminal.

Central technology ELA T2 - Renewal and maintenance

Replacement of existing ELA in Terminal 2 by setting up a new voice alarm system in accordance with DIN CEN/TS 54-32 and DIN EN 54-16 for alarm and operational announcements.

18 new control centers are to be set up and put into operation in the terminal.

Other requirements include in particular:

- Setting up the networking of all ELA control centers with each other based on the structured fiber optic cabling available at the site

- Construction of firefighter control panels

- new call stations for company announcements

- Integration into the existing higher-level ELA management system

- Integration into the digital gate announcement system

- Transfer of fault messages to building automation

- Control of the bundled radio system

All work is carried out while terminal 2 is in operation. Continuous readiness for alarm and operational announcements is mandatory.

Full maintenance for the entire plant

Central technology ELA GSH - renewal and maintenance

Replacement of existing ELA in the baggage sorting hall by setting up a new voice alarm system in accordance with DIN CEN/TS 54-32 and DIN EN 54-16 for alarm and company announcements.

Ten new headquarters are to be set up and put into operation in the baggage sorting hall.

Other requirements include in particular:

- Setting up the networking of all ELA control centers with each other based on the structured fiber optic cabling available at the site

- Construction of firefighter control panels

- new call stations for company announcements

- Integration into the existing higher-level ELA management system

- Transfer of fault messages to building automation

- Control of the bundled radio system

All work is done while the baggage sorting hall is in operation. Continuous readiness for alarm and company announcements is imperative.

Full maintenance for the entire plant

Download full details as .pdf
The Buyer:
Terminal 2 Gesellschaft mbH & Co oHG
CPV Code(s):
31213300 - Cable distribution cabinet
32342300 - Microphones and speaker sets
32343000 - Amplifiers
34997000 - Control, safety or signalling equipment for airports
45213331 - Airport buildings construction work
45314000 - Installation of telecommunications equipment