The subject of the contract is the delivery of one brand new telehandler as part of the implementation of Contract No. 2 entitled "Supply of equipment for the Municipal Waste Disposal Plant in Suwałki in msc. Raczkowska 150A" covering the purchase and delivery of two telehandlers with a bucket volume of min. 1.5 m3, implemented as part of the project entitled "Construction of an installation for purification of selectively collected fractions of municipal waste at the Municipal Waste Disposal Plant in Suwałki in Zielone Kamedulskie, Raczkowska 150A", co-financed from the Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020, Priority Axis II – Environmental protection, including adaptation to climate change, Measure 2.2 Municipal waste management. The telehandler will be designed to work with municipal waste for the needs of the plant of Przedsiębiorstwo Gospodarki Odpadami w Suwałki Sp. z o. o., including ongoing service of the newly built installation for cleaning the fraction selectively collected as part of the above-mentioned project.
1.The subject of the contract is the delivery of one brand new telehandler under the implementation of Contract No. 2 entitled "Supply of equipment for the Municipal Waste Disposal Plant in Suwałki in msc. Raczkowska 150A" covering the purchase and delivery of two telehandlers with a bucket volume of min. 1.5 m3, implemented as part of the project entitled "Construction of an installation for purification of selectively collected fractions of municipal waste at the Municipal Waste Disposal Plant in Suwałki in Zielone Kamedulskie, Raczkowska 150A", co-financed from the Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020, Priority Axis II – Environmental protection, including adaptation to climate change, Measure 2.2 Municipal waste management. The telehandler will be designed to work with municipal waste for the needs of the plant of Przedsiębiorstwo Gospodarki Odpadami w Suwałki Sp. z o. o., including ongoing service of the newly built installation for cleaning the fraction selectively collected as part of the above-mentioned project. 2.Completeness requirements. All equipment should correspond to the complete, catalog equipment version, including the company's / dealer's catalog of additional options / accessories, which means that in cases not specified, at least standard and optional equipment is required if the catalog is accompanied by the required options indicated above as part of the equipment packages.3.Other requirements. 1) The Contractor shall train, at its own expense, the personnel indicated by the Contracting Authority in the field of operation, maintenance and health and safety of the subject of the contract. The training should be carried out at the latest on the day of signing the acceptance protocol without comments and should include a theoretical and demonstration part. The fact of training will be confirmed by a protocol. 2) Additional conditions: • delivery of the technical specification of the offered telehandler together with the CE certificate, • delivery of a guarantee with a warranty book and instructions in Polish of the subject of the order, • delivery of the audit book of the device issued on the basis of the decision of the Office of Technical Inspection allowing the operation of the device (if required), • start-up of the telehandler at the place of delivery, • necessary set of tools for daily loader operation telescopic, • service during the warranty period – service response during the warranty period up to 48 hours on working days from Monday to Friday. The above description contains minimum requirements, which means that the Contractor may offer the subject of the contract characterized by better technical and functional parameters, provided that they will not affect higher operating costs. 3) The minimum warranty period is 24 months or 4000 operating hours of the loader (whichever comes first), counted from the date of final acceptance of the subject of the order. 3. Terms of delivery of the subject of the order 1) The document confirming the delivery will be a receipt report without comments signed by authorized representatives of the parties. 2) The Ordering Party requires that the subject of the contract be completed within 30 days from the date of signing the contract at the latest. 3) The Ordering Party undertakes to provide appropriate conditions for the efficient acceptance of the subject of the contract. 4) The Ordering Party may refuse to accept the subject of the contract and demand its repair or withdraw from the contract due to the fault of the Contractor. 5) The Contractor shall notify the Contracting entity of the date of delivery of the subject of the contract no later than 2 working days before the planned date of acceptance. The notification should be made in writing and sent by post or e-mail. 6) The Contracting Authority has the right to refuse to accept the subject of the contract in the event of failure by the Contractor to meet the deadline specified in the Contractor's offer.