Ventilation works (BA 4)
TM 1: Modification MTT and bathing department
TM 2: reconstruction of 22 patient rooms
TM 3: Renewal ventilation unit wet therapy.
- dismantling existing air duct network and a central exhaust fan,
- Complete ventilation installation (exhaust air) for 22 patient rooms,
- Air duct network made of galvanized sheet steel or galvanized spiral ducts incl. All required fire barriers,
- dismantling existing air duct network and a central ventilation unit (MTT area),
- Installation of a new ventilation system for the MTT area with device installation in an existing ventilation center. Air output approx. 2 700 cbm / h with pre-cooling equipment,
- dismantling existing central ventilation unit (wet therapy),
- Installation of a new ventilation unit with heat recovery together with all necessary adjustments to the air duct network in the existing ventilation center. Air volume about 5 300 cbm / h.