Each batch will be assigned separately. The building to be built is to accommodate the Departmental Culinary Workshop (ACD), with a net useful area of 1,387 m
Special foundations.
Interior joinery - signageInterior joinery - signage.
Plastering - paintingPlastering - painting.
Suspended ceilingsSuspended ceilings.
floor coveringsFloor coverings.
Lifting deviceLifting device.
Heating / ventilation / plumbingHeating / ventilation / plumbing.
Strong currents / weak currentsStrong currents / weak currents.
Partitions and Insulated DoorsPartitions and insulated doors.
Cooking — Electromechanics — LaundryCooking — electromechanical — launderette.
Food cold productionProduction of food cold.
General earthworksGeneral earthworks.
Stainless steel and various equipmentStainless steel and various equipment.
Structural work — masonryLarge work — structure — masonry.
Metal frameMetal frame.
Waterproofing - coverWaterproofing - cover.
Facades — sidingFacades — siding.
Exterior joinery - blackoutExterior joinery - blackout.
Locksmithing - metalworkLocksmith - metalwork.
Dock EquipmentsDock facilities.