The project is to construct and site 43no. Beach Huts in total with an initial 16no total, to be installed in by end of September 2022 with the remainder to be completed by the end of March 2023 as described and detailed in the specification and drawings.
The project is to construct and site 43no. Beach Huts in total with an initial 16no total, to be installed in by end of September 2022 with the remainder to be completed by the end of March 2023 as described and detailed in the specification and drawings.