The services of the contractor (contractor) include the technical planning / scope of technical equipment in accordance with Part 4 Sec. 2 HOAI. LPH 2-9 must be completed (due to own contributions in some areas also omission of basic or partial services of basic services). In addition to basic services, special services must be provided:
_Bearbeiten BNB requirements: Target agreement silver standard (without certification) according to the Sustainable Building Guideline
_Übertragen Planning and cost data (PLAKODA) in digital survey forms
_Überwachen Rectification of defects within the limitation periods
,
Initially, only services for the construction of the HU-Bau (LPH 2-4) will be commissioned. It is intended to commission the further services in stages after approval of the document (step-by-step contract). There is no legal entitlement to the transfer of the other benefits as well as the special benefits.
,
,
The Germersheim District Court is located in the city centre of Germersheim. The courtrooms are currently located in two now connected historical parts of the building, which were built in the years 1853-1865. In order to be able to guarantee service operations in the future, extensive measures are necessary, such as continuous barrier-free access by creating a new entrance including a gate, the addition of a staircase with elevator, general upgrading of fire protection and the improvement of the statics of the wooden beam ceilings.
,
Energy optimisation and the requirements of sustainable construction, taking into account economic efficiency, must be implemented.
,
At the same time, the building services equipment must also be upgraded or replaced, such as heat generation systems, electrical and IT cabling and sanitary facilities.
,
The construction of a photovoltaic system on an existing roof surface as well as the requirements for electromobility in public/other buildings must be implemented.
,
Since the size of the property allows only very few alternative options on its own property, an interim solution is necessary. This is to be determined as part of an economic feasibility study. After deciding on the most suitable option, it is still intended to commission the planning services of the interim solution. In the course of this, the development of the process planning and the participation of the complete implementation are also commissioned.
,
GFA (existing building + staircase extension): approx. 2,160 m² Inspection follows
Estimated construction costs (gross): 2,600,000 EUR (KG 300), 1,200,000 EUR (KG 400)
Dates: Start 09/2023, HU-Bau 05/2024, Bauauswerk. 09/"25-03/"28, Handover 04/2028
,
Division V: The drinking water installation, the entire heating system and the sewage installation are to be renewed. The heating system, as well as a potential ventilation system, is to be planned in accordance with the BNB silver standard for the measure and the "Climate-neutral state buildings" guideline and with regard to the sustainability goals for the criterion "indoor air quality" (BNB_BK 3.1.3).
,
specifications
Participation in the preparation of a project-specific energy specification based on the model according to Annex B4 of the Sustainable Building Guideline and the "Climate-Neutral State Buildings" guideline, taking into account all aspects listed therein
,
a) Creation of an energy concept in power phase 2. The concept includes, in particular, the detailed examination of alternative energy supply systems as well as the use of renewable energies while at the same time examining the economic efficiency in compliance with the economic efficiency requirement.
,
b) Updating the energy concept in service phases 2 to 5
,
c) Updating the aforementioned concept to the actually realized condition of the building in work phase 8
,
a) Creation of a ventilation concept in service phase 2/3. The concept contains proof of the required or desired air changes in relation to the dimensions and occupancy rate of the common rooms as well as the corresponding times of use - regardless of the type of ventilation selected (free and/or mechanical ventilation), taking into account the aspects of thermal comfort.
,
b) Updating the above-mentioned concept to the actually realized condition of the building in work phase 8
,
a) Creation of a measurement and monitoring concept in performance level 1
,
b) Updating the above-mentioned concept to the actually realized condition of the building in work phase 8
,
Participation in the creation of a user manual with generally understandable information for the building users in service phase 8.
,