Construction work for multi-dwelling buildings and individual houses

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 October 2022
Closing Date:
25 November 2022
Location(s):
UKK23 Somerset (UK UNITED KINGDOM)
Description:
North Taunton and Oake Woolaway Refurbishment

This procurement is being conducted as an Open Procedure in compliance with Somerset

West and Taunton contract Standing Orders. The opportunity is being advertised via the

Procontract portal, Contracts Finder and the Find a Tender Service in compliance with

PCR2015 Procurement Regulations.

If an Applicant is bidding for both Lots, a completed set of tender documents must be submitted separately for each Lot.

At the conclusion of the Award stage, the intention is to award the Contract to one or two

Applicants for Lots 1 and 2.

Lot 1 Refurbishment of Woolaway Houses North Taunton – Phase E

Lot 2 Refurbishment of Woolaway Houses Oake

The Works comprise the complete refurbishment of the properties on the basis that all the

external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full

package of internal replacement and upgrading is provided all as shown and described on

the tender and contract drawings and the specifications


Lot 1 Refurbishment of Woolaway Houses North Taunton – Phase E

The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications.

The Works will be executed in Sections using the following parameters:

Section 1: Works to 4 Bodmin Road; 9, 25 & 27 Dorchester Road Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession.

Section 2: Works to 17, 23, 33 & 35 Dorchester Road Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession.


Lot 2 Refurbishment of Woolaway Houses Oake

The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications.

The Works will be executed in Sections using the following parameters:

Section 1: Works to 21, 23 and 24 Oake Close Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession.

Section 2: Works to 17, 18 and 19 Oake Close Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession.

Section 3: Works to 2, 3 and 4 Oake Close Date of Possession to be 2 weeks after the completion of Section 2. The Date for Completion to be 16 calendar weeks after the Date of Possession.

Section 4: Works to 25 Oake Close Date of Possession to be 2 weeks after the completion of Section 3. The Date for Completion to be 16 calendar weeks after the Date of Possession.

Download full details as .pdf
The Buyer:
Somerset West and Taunton Council
CPV Code(s):
45210000 - Building construction work
45211000 - Construction work for multi-dwelling buildings and individual houses