The measure replacement 2-3. BA with the building parts F1 and G is located in the south-east area of the property of the Friedrich-Ebert-Krankenhaus (FEK) in Neumünster. Access to the construction site is via the Sachsenring road. The building part F1 is enclosed on almost all sides by buildings. The building section F1 borders directly on existing building sections in which hospital operations continue. Special care must therefore be taken in the peripheral areas of the construction site. Part G of the building will be a completely new building on an existing open space and connected via F1.
Quantity structure (approximate values):
- 280 patient cabinets,
- 137 built-in cupboards in wet rooms,
- 6 control centers,
- 14 pantries,
- 10 jobs unclean work,
- Furniture locking system approx. 310 cylinders.