Structural design
For the 58 service apartments of approx. 145m2 each of the JVA Cologne Ossendorf, Rochusstr. house numbers 400-516 (along Butzweilerstraße), the basic renovation and drainage, as well as the insulation of the cellars is pending.
In the course of the basic renovation described above, the building blocks will be renovated in sections and dismantled down to the shell. The roof trusses of the service housing units must be used as
the top floor ceiling must also be treated.
For the planning of the upcoming renovation work, an object planner will be commissioned, with whom the tasks of LPs 1-6 Fee Zone III arising from the planned measures must be coordinated with the structural engineer.
The planning of the building blocks is a repeat performance.
The special feature of the measure is also the construction phase-by-phase approach, in which several building blocks are combined in one construction phase to be renovated and processed.
The overall measure for the renovation of service apartments is based on a tight schedule, which must be adhered to due to the dependencies on the main measure of the new construction of the prison. This will result in the start of construction with a test bar 09/2024 and a final handover date for the renovated
Service apartments to the user until Q4/ 2030.