Road construction works - K39 - thorough rehabilitation between Jork-Borstel and Cranz in three construction phases; here: Construction work in the 3rd construction phase
Road construction work with traffic routing - K39 - thorough rehabilitation between Jork-Borstel and Cranz in three construction phases; here: Construction work in the 3rd construction phase
The district of Stade is renovating the K 39 between the port of Borstel over several years
and the district boundary to Cranz. In 2021 to 2023, the first and second
Section from Borstel harbour to the junction of the prison has been rehabilitated. The third section with a length of approx. 1,820 m from the junction of the prison to the state border is hereby put out to tender.
The road rehabilitation is carried out by installing a reinforced ballast base course on the existing road substructure. The section from the Hamburg state border is being fully expanded over a length of approx. 450 m. The asphalt layers will be renewed over the full length of 1,820 m. The cycle path running parallel to it, including the gravel base course, will be completely renewed. The profile of the roadway and the cycle path is built from the northern edge of the road. For the surface drainage of the roadway, the southern shoulder and the cycle path, the cycle path on the southern side will receive a gutter curb including road drains. For the collection and treatment of surface water, a
Rainwater sewer incl. control and settling shafts manufactured. The discharge takes place at three discharge points into the Hinterbracker Wettern to the south. The southern access roads will be adapted to the new heights. The length and inclination of the access roads can be adjusted in the course of construction (location).