New construction of vocational school Weilheim - 2018 / 11.2 / 137 420 heating
Leitmengen:
- heat center with wood chips plant including discharge and gas peak load boilers incl. Distribution and pressure maintenance,
- approx. 4,100 m heating pipes DN 15 - DN 100 according to EN10255 or 10210,
- approx. 800 m heating pipelines rust-proof in the floor structure, including fittings and connecting pieces,
- approx. 200 m of gas pipelines,
- approx. 280 units of sectional heating elements for classrooms, corridors and stairwells,
- about 8 pcs of underfloor convectors,
- approx. 7 pcs postheater for ventilation systems.