Description:
Airport München_2023-1003572_ELA T2 and GSH (baggage sorting hall) - Renewal of loudspeakers and cable networks

Delivery, installation and commissioning of loudspeakers and cable networks in the T2 and GSH area during ongoing terminal operations.

As part of the generational change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented. A special type of loudspeaker shall be provided by the client and shall be installed and put into operation by the contractor. The procurement of this loudspeaker is the subject of a parallel procurement procedure (2023-1003582).

The construction work for the T2 was divided into 4 partial lots. The client plans to provide services mainly on a day-to-day basis.

In order to do justice to the current economic conditions, a price escalation clause is provided for in the tender documents.

In the context of the request to participate, it is not necessary for a candidate to specify for how many lots or for which lots the request to participate will be submitted. A determination as to which lots are offered is only made by the bidders in the context of the submission of the offer, after the bidders have been invited by the contracting authority to submit a bid after the conclusion of the participation competition.

Details on the course of the procurement procedure and the content of services can be found in the informative procurement documents (see point I.3 of the contract notice).

ELA T2 - Pier Nord: Loudspeakers and cable networks

As part of the generation change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated in partial lots. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented.

The services are to be carried out during ongoing airport operations. The work is mainly carried out in the security area of the airport.

The associated PA control panel technology is the subject of a separate order.

Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the necessary conversion phases).

ELA T2 - Main Building North: Loudspeakers and cable networks

As part of the generation change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated in partial lots. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented.

The services are to be carried out during ongoing airport operations. The work is mainly carried out in the security area of the airport.

The associated PA control panel technology is the subject of a separate order.

Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the necessary conversion phases).

ELA T2 - Main Building South: Loudspeakers and cable networks

As part of the generation change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated in partial lots. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented.

The services are to be carried out during ongoing airport operations. The work is mainly carried out in the security area of the airport.

The associated PA control panel technology is the subject of a separate order.

Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the necessary conversion phases).

ELA T2 - Pier South: Loudspeakers and cable networks

As part of the generation change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated in partial lots. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented.

The services are to be carried out during ongoing airport operations. The work is mainly carried out in the security area of the airport.

The associated PA control panel technology is the subject of a separate order.

Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the necessary conversion phases).

ELA baggage sorting hall: loudspeakers and cable networks

As part of the generation change of the PA systems of Terminal 2 and the baggage sorting hall, the loudspeakers and cable networks are to be updated in partial lots. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks are to be completely converted to A/B cabling; all loudspeakers are to be replaced and partly. to be supplemented.

The services are to be carried out during ongoing airport operations. The work is mainly carried out in the security area of the airport.

The associated PA control panel technology is the subject of a separate order.

Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the necessary conversion phases).

Download full details as .pdf
The Buyer:
Terminal 2 Gesellschaft mbH & Co oHG
CPV Code(s):
31342000 - Insulated cable junctions
32342000 - Loudspeakers
32412000 - Communications network
45213331 - Airport buildings construction work
45311100 - Electrical wiring work
45314000 - Installation of telecommunications equipment
45314300 - Installation of cable infrastructure