Works for complete or part construction and civil engineering work | Tenderlake

Works for complete or part construction and civil engineering work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 February 2020
Closing Date:
14 May 2020
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Renewal of the Waldenburgerbahn, master builder lot 3

BehiG-conf. Umgest. HST Lampenberg / Ramlinsburg with usable platform length from 90 m, new HST infrastructure, bicycle parking spaces, parking lots u. new technology building. Extension of the railway line from single-track to double-track operation over 1.7 km between HST Lampenberg / Ramlinsburg and Bahnüberg. Steinenweg. Expansion / renewal of single track from level crossing Steinenweg to Hölstein entrance. Relocation of the Bärenmattenstrasse along a length of around 300 m including a new roundabout and a new retaining wall along the railway. 40 m long retaining wall at the overpass stop, widening of the rocky outcrops of Spitzenberg and Ost, 150 m long retaining wall along Par. 611, adjustment of the level crossing. Bärenmattenstrasse, 90 m long retaining wall along Parz. 1442, block walls, demolition and rebuilding of the brook wall Vordere Frenke entrance Hölstein. Adjustment of various stream crossings under the railway line and plant management in the project perimeter. Renewal of Hauensteinstrasse over its entire length, partly with the creation of new side cycle paths.

BehiG-conf. Umgest. HST Lampenberg / Ramlinsburg with usable platform length from 90 m, new HST infrastructure, bicycle parking spaces, parking lots u. new technology building. Extension of the railway line from single-track to double-track operation over 1.7 km between HST Lampenberg / Ramlinsburg and Bahnüberg. Steinenweg. Expansion / renewal of single track from level crossing Steinenweg to Hölstein entrance. Relocation of the Bärenmattenstrasse along a length of around 300 m including a new roundabout and a new retaining wall along the railway. 40 m long retaining wall at the overpass stop, widening of the rocky outcrops of Spitzenberg and Ost, 150 m long retaining wall along Par. 611, adjustment of the level crossing. Bärenmattenstrasse, 90 m long retaining wall along Parz. 1442, block walls, demolition and rebuilding of the brook wall Vordere Frenke entrance Hölstein. Adjustment of various stream crossings under the railway line and plant management in the project perimeter. Renewal of Hauensteinstrasse over its entire length, partly with the creation of new side cycle paths.

Download full details as .pdf
The Buyer:
BLT Baselland Transport AG Infrastruktur
CPV Code(s):
45200000 - Works for complete or part construction and civil engineering work
45221250 - Underground work other than tunnels, shafts and subways