BehiG-conf. Umgest. HST Lampenberg / Ramlinsburg with usable platform length from 90 m, new HST infrastructure, bicycle parking spaces, parking lots u. new technology building. Extension of the railway line from single-track to double-track operation over 1.7 km between HST Lampenberg / Ramlinsburg and Bahnüberg. Steinenweg. Expansion / renewal of single track from level crossing Steinenweg to Hölstein entrance. Relocation of the Bärenmattenstrasse along a length of around 300 m including a new roundabout and a new retaining wall along the railway. 40 m long retaining wall at the overpass stop, widening of the rocky outcrops of Spitzenberg and Ost, 150 m long retaining wall along Par. 611, adjustment of the level crossing. Bärenmattenstrasse, 90 m long retaining wall along Parz. 1442, block walls, demolition and rebuilding of the brook wall Vordere Frenke entrance Hölstein. Adjustment of various stream crossings under the railway line and plant management in the project perimeter. Renewal of Hauensteinstrasse over its entire length, partly with the creation of new side cycle paths.
BehiG-conf. Umgest. HST Lampenberg / Ramlinsburg with usable platform length from 90 m, new HST infrastructure, bicycle parking spaces, parking lots u. new technology building. Extension of the railway line from single-track to double-track operation over 1.7 km between HST Lampenberg / Ramlinsburg and Bahnüberg. Steinenweg. Expansion / renewal of single track from level crossing Steinenweg to Hölstein entrance. Relocation of the Bärenmattenstrasse along a length of around 300 m including a new roundabout and a new retaining wall along the railway. 40 m long retaining wall at the overpass stop, widening of the rocky outcrops of Spitzenberg and Ost, 150 m long retaining wall along Par. 611, adjustment of the level crossing. Bärenmattenstrasse, 90 m long retaining wall along Parz. 1442, block walls, demolition and rebuilding of the brook wall Vordere Frenke entrance Hölstein. Adjustment of various stream crossings under the railway line and plant management in the project perimeter. Renewal of Hauensteinstrasse over its entire length, partly with the creation of new side cycle paths.