Viktoriastift Clinic, Cecilienhöhe 3, 55543 Bad Kreuznach: Restructuring of house 10, complete renovation of the historic building (built in 1913) with partly Renewal of roof areas. Operation is discontinued during the construction phase.
It involves the construction of an access bridge as part of the renovation of a children's and adolescent hospital.
Here: Delivery and installation of steel bridge construction:
Hot-dip galvanized steel construction: 9.10 tons,
access lock, gate: 2 pcs,
grating surface: 32 m²,
railing: 25 m,
Powder coating: components mentioned above,
steel frame: 300 kg,
Stainless steel grid including mounting frame: 110m²