The Facility for Antiproton and Ion Research (FAIR) will be one of the leading-edge particle accelerator facilities for basic research as well as applied science experiments. The FAIR project is an international collaboration of 16 partner organisations. The project is currently being built at the GSI complex and is designed to work in conjunction with the existing GSI system. To generate and maintain the operating pressures required in the FAIR and GSI accelerators, ion getter pumps will be used. These pumps were already procured in the framework contract 39_RV_Ion-Getter-Pumpen_2020_Framework agreement. Now the controllers required to operate the pumps will be procured.
These controllers are required for different accelerator parts at FAIR, GSI and FZ Jülich (third party).
The Facility for Antiproton and Ion Research (FAIR) will be one of the leading-edge particle accelerator facilities for basic research as well as applied science experiments. The FAIR project is an international collaboration of 16 partner organisations. The project is currently being built at the GSI complex and is designed to work in conjunction with the existing GSI system. To generate and maintain the operating pressures required in the FAIR and GSI accelerators, ion getter pumps will be used. These pumps were already procured in the framework contract 39_RV_Ion-Getter-Pumpen_2020_Rahmenvertrag. Now the controllers required to operate the pumps will be procured.
These controllers are required for different accelerator parts at FAIR, GSI and FZ Jülich (third party).
Framework agreement - over four years. Maximum scope of 300 pieces (290 negative polarization, 10 positive polarization)