The suspension bridges at The Triangle link (Storda bridge and Bømla bridge) was completed in 2000/2001, and are suspension bridges executed with aerially spun parallel wire cables. The cables were applied with a zinc containing silastic paste, coiled with steel wire and painted.
It is ow planned to install a dehumidifying system for the carrier cables for the suspension bridges.
This includes dehumidifying of cables, splay chamber and tower house. The assignment includes delivering of complete planning and design work for these dehumidifying installations.