700 m
Glazing work consisting of:
- approx. 320 m steel angle 160/160/15 mm, installation on steel supports and concrete wall as mounting base for profiled glass facade on the upper floor of the sports hall;
- approx. 699 m
- approx. 699 m
- 1 pc. feedthrough for supply air element approx. 2.00 x 1.00 m;
- Approx. 70 m steel angle 70/70/10 mm, installation on concrete wall as mounting base for profiled glass facade on the ground floor of the sports hall;
- approx. 84 m
- approx. 84 m
- Building lettering with adhesive films.