The work is taking place on the waste reception sites spread over ten of the twelve municipalities that make up the CCCGST. The project provides for the renovation of six (6) existing eco-points located in Cogolin, plan de la Tour, La Garde Freinet, La Croix Valmer, Le Rayol Canadel and Saint Tropez, the renovation of three (3) existing super-waste centers located in Cavalaire, Sainte-Maxime and Grimaud and the construction of one (1) new super-waste collection center located in Ramatuelle. The market is allotted.
Macro-lot infrastructureDemolitions, platform earthworks, roads, networks, foundations and civil engineering, retaining walls, equipment, exterior locks, signage, fences.
Macro-lot buildingEarthworks of building foundations, Go, building foundations, drain, waterproofing, exterior joinery, counter-partitions and partitions, linings, false ceilings, floor and wall covering, interior joinery, locksmith, interior ironwork, painting.
Macro-batch equipmentLighting, video protection, access control.
Green spaces and wateringGreen spaces and watering.