Civil engineering and equipment contract which includes the construction of a reservoir and a discharge station as well as the rehabilitation of 2 existing reservoirs.
- pumping station of the resource:
Installation of 3 pumps of nominal flow 150 m
- creation of a 2,000m tank
- Realization of a set of valves to allow the bypass of Tabur 3 bis or Tabur 3 while ensuring the continuity of service,
- extension of the Tabur 3 hydraulic room and addition of a discharge pump with a nominal flow rate identical to the 2 existing ones, including the rehabilitation of the existing room,
- enlargement of the pebble gates chamber and installation of a variable speed booster (Q = 5 m
- renewal and rehabilitation of existing equipment in the piton pebble valve chamber and implementation of a turbidimeter controlled by automatic opening and closing valves.
The firm tranche concerns the execution studies for the rehabilitation of the tanks of Parny and Piton Cailloux.