Vascular medical center 2nd construction phase and adjustment of operating room adjacent area existing building 4241, expansion of an existing building with 3 operating rooms, construction of a technical center in the DG.
- Cement-bonded fire protection panel facades, 542 m
- Thermal insulation of external wall structures, 291 m
- Check the subsurface, 34 m
- Cleaning with a steam jet device, 34 m
- Prime absorbent substrates on walls, 34 m
- Protection of windows and doors, 33 m
- Thermal insulation facade, 278 m
- Bossing by milling out the insulation, 14 m,
- Surcharge for extra thickness of insulation, 10 m
- Movement joints in ETICS, 32 m,
- Facade base, 12 m
- Full-surface cement-free reinforcement with fabric, 245 m
- Bossing, horizontal, 92 m,
- Impact area / armored fabric, 12 m
- Finishing plaster rough, dark, 260 m
- Surcharge for bossing the finishing plaster, horizontal, 92 m,
- Window, door connection / plastering strip, 84 m,
- Façade paint - Lotus effect light and dark, 335 m