Lot 13.2: Steel-Glass Walls
Total execution period: 04.12.2023 - 11.10.2024
Single deadlines:
Submission of verifiable work planning: 19.01.2024
Lot 13.2: Steel-Glass Walls
Lot 13.2: Steel-Glass Walls
Total execution period: 04.12.2023 - 11.10.2024
Single deadlines:
Submission of verifiable work planning: 19.01.2024
Steel-glass door elements 1.60/4.30 m with 1 door 2 pcs.
Steel-glass door elements 1.80/3.40 m with 1 door 1 pc.
Steel-glass door elements 1.70/3.40 m with 1 door 1 pc.