the procurement procedure used is: open tendering. The Framework Agreement with purchase orders with maximum is made pursuant to articles L2125-1 1°, R. 2162-1 to R. 2162-6, R. 2162-13 and R. 2162-14 of the CPC. It is concluded for an initial period of one year from its notification.The purpose of the consultation is the maintenance and operation of the drinking water service up to 10 municipalities in the territory according to the needs identified. This consultation includes, among other things: -maintenance and monitoring of the operation of works related to the production, storage and distribution of drinking water—maintenance, monitoring of network operations-setting up of a stand-by service for works and networks-meter reading, exchanges with the billing and renewals of meters-carrying out work on networks within the limits set by CCTP-Flow and pressure testing of fire hydrants
the procurement procedure used is: open tendering. The Framework Agreement with purchase orders with maximum is made pursuant to articles L2125-1 1°, R. 2162-1 to R. 2162-6, R. 2162-13 and R. 2162-14 of the CPC. It is concluded for an initial period of one year from its notification.The purpose of the consultation is the maintenance and operation of the drinking water service up to 10 municipalities in the territory according to the needs identified. This consultation includes, among other things: -maintenance and monitoring of the operation of works related to the production, storage and distribution of drinking water—maintenance, monitoring of network operations-setting up of a stand-by service for works and networks-meter reading, exchanges with the billing and renewals of meters-carrying out work on networks within the limits set by CCTP-Flow and pressure testing of fire hydrants