Polder Bellenkopf / Rappenwört: PL7-1, LÜ power supply and electrotechnical equipment

The Bellenkopf / Rappenwört polder (BeRa) is part of the Integrated Rhine Program (IRP) in the Karlsruhe district. The retention area (RHR) will have a retention volume of approx. 14 million m 3 on approx. 510 ha. The polder consists of a large number of individual measures, which are divided into 9 lots. These are further subdivided into planning and construction lots.

The plan approval decision has been available since December 2020. In 2021, the planning services for the structural implementation will be awarded and the implementation planning will begin. The completion target of the structural implementation is 2028.

Further details on the project can be found in the tender documents on the award platform (documents number group 500). A brief description of the pursued lot formation can be found in document 510.

With this contract announcement, the awarding of freelance services for the following (planner) lot is pursued:

Planner lot PL7-1: Cross-lot power supply and electrotechnical equipment: specialist planning § 55 HOAI.

II.2.4.1) Sub-area to be processed with the contract to be awarded:

The services to be awarded for planner lot PL7-1 relate to measures in lot 7. The following can be named as essential objects:

- BL7-1: Network station and energy supply pumping station Neuburgweier,

- BL7-2: network station and power supply pumping station south / control station,

- BL7-3: network connection, network station N 812 in Rheinpark Rappenwört,

- BL7-4: mains connection, network station N 409 on Fritschlachweg,

- BL7-5: grid station and power supply pumping station north,

- BL7-6: Construction of the power supply network for all operational facilities of the polder,

- BL7-7: Electrotechnical equipment of individual systems (structures / operating facilities of the polder) with switchgear for the energy supply including the associated MSR technology.

A detailed overview of all structures / systems to be processed, including other planning lots, can be found in document 510 (list of measures) of the tender documents on the tender platform.

In a separate, parallel planner lot PL7-2, planning services for the cross-lot control technology (control of all systems) will be processed. With this planner lot PL7-2 and the other planner lots for the object and specialist planning of the buildings, close coordination on interfaces is required.

II.2.4.2) Performance profile:

The task is divided into two focal points (levels):

Task focus 1 (overall project level):

- Concept development for a secure, higher-level power supply for all structures with electrical systems,

- Elaboration of standardization specifications for the electrotechnical equipment of structures in the retention area.

Task focus 2 (building level):

- Planning of electrotechnical systems for the energy supply of buildings including their consumers as well as the system automation related to the energy supply. The interfaces to other specialist planning are the respective building installation (from the connection / switchgear via the specialist planner of the other lots) and the standardized data connection to the central control system (to be coordinated across lots).

The service profile PL7-1 essentially includes the following services to be provided for the aforementioned objects:

1) Planning of supply networks for electrical power supply for spatially distributed connection participants up to 2 MVA with special consideration of a high availability according to § 55 HOAI, LP 1-9 without LP 4.

2) Planning of electrical equipment at voltage levels up to and including 20 kV for power distribution and associated interfaces for system automation, measurement technology and communication technology according to § 55 HOAI, LP 1-9 without LP 4.

Further details can be found in the description of services (document 302 of the tender documents on the tender platform).

II.2.4.3) Step-by-step commissioning:

The assignment takes place in stages:

Stage I = basic contract: development of cross-lot supply concepts as well as services for planning the power supply up to preparing the tender documents (service phase 6)

Stage II = optional services: Services of the construction phase (from service phase 7).

Download full details as .pdf
The Buyer:
Regierungspräsidium Karlsruhe – Referat 53.2
CPV Code(s):
71314000 - Energy and related services
71334000 - Mechanical and electrical engineering services
71356400 - Technical planning services
71521000 - Construction-site supervision services