Vaggeryds Energi AB (“Orders”) intends to build a brand new Värmeverk for district heat production to Vaggeryd, Skillingaryd and Götafors. Initially, two (2) solid fuel boilers and a smaller oil boiler will be procured for this Heating Plant. But the area will also be prepared for another larger solid-fuel boiler and an oil boiler.
The boiler effect for the solid fuel boilers is 6 MWoutput and is fired with forest chips with a moisture content between 35 to 55%. Intrimming and performance tests are limited to a moisture content between 40 to 50%. Oil boiler must have a power of 5 MWoutput.
The procurement will be a total contract, which includes all things such as foundations, buildings and process equipment.