The exterior of the new building for the Germersheim fire brigade is an elongated, compact cube in which the various uses are accommodated. Building key data:
External dimensions: approx. 95 mx 30 mx 7.6 m,
Usable area: 2,472.10 m
GFA: 3,643.30 m
BRI: 19 470 m.³
Vehicle hall and warehouse as well as the foyer in the north-east extend over the entire height of the building, the areas with operations center, breathing protection area and clothing care, technology, social and training rooms are arranged in an L-shape on 2 levels.
Except for the steel columns in the foyer, the load-bearing structure is made of reinforced concrete (walls, columns, ceilings). Along the longitudinal facades and in the center of the building, columns or walls are arranged in a grid of 4.5 m. Semi-prefabricated beams are placed on the supports in the transverse direction of the building. Between the girders planned at a distance of approx. 4.5 m there is a flat slab made of uniaxially tensioning semi-prefabricated slabs with an in-situ concrete supplement on top.
- approx. 72 m
- 3 single windows W x H approx. 4 250 x 1 540 mm 3 parts, steel frame, 3-gang insulating glass,
- 1 pc single window W x H approx. 8 640 x 1 570 mm 3 parts, steel frame, 3-gang insulating glass,
- 3 single windows W x H approx. 2,800 x 820 mm, F 30 requirements, steel frame, fixed glazing, insulating glazing with fire protection requirements.