Carpentry work - revise existing window and door elements
Masking of windows, doors 150,00 m2
Covering sandstone walls and arches 250.00 m
Facade scaffolding as metal scaffolding, LK3, W06 180,00 m2
Providing façade scaffolding 720,00 m2Where
Scaffolding extensions brackets, bracket width 0.33m inside 80.00 m
Consoles, 0,33m 320,00 mWo
Climbing stairs, as an allowance 1 pc
Stairs 8 hours
Repainting of existing exterior windows with preparation 11 pcs
New glazing of existing interior windows with preparation 10 pcs
Addition of window putty on glazing 150.00 m
Permanently elastic joint, inside 250.00 m
Grouting with compression tape 340.00 m
Repainting of the existing exterior door with preparation, approx. 4.05x3.23 m 1 pc
Repainting exterior existing door with preparation, approx. 0.95x1.95 m 1 pc
Repainting interior existing door with preparation, approx. 1.03x2.17 m 1 pc
Repainting platform stairs to the stage 1 pc
Painting portal frame stage 1 pc