The building to be constructed is planned for use as an administrative building. In the resulting cubature, office use, including associated social, storage and technical rooms, as well as associated traffic areas are planned on 5 full and one staggered floors. In addition to the own space in the 4 lower levels, reserve space and space for external letting with administrative and commercial use are provided for the 4th floor and the second floor.
Total open space to be created of approx. 3,250 m
- Production of studded membrane 145 m;
- Demolition and restoration of asphalt road Gewandhausstrasse 40 m
- Tree trunk protection 6 trees, 2 trees & clear roots;
- Clear vegetation layer 200 m
- Soil removal with disposal approx. 1 210 m
- Soil removal and reuse approx. 330 m
- Additional gravel-rubble-soil mixture approx. 750 m
- Supplement: LAGA Z1.2 soil disposal approx. 310 m
- Supplement: disposal of contaminated sites LAGA> Z2, DKI approx. 500 m
- Supplement: disposal of contaminated sites LAGA> Z2, DKII approx. 400 m
- Deliver and install filling floor approx. 75 m
- Flat paved areas approx. 1,950 m
- Planum vegetation areas approx. 1 170 m
- Soil modeling and work in the embankment area 265 m
- Frost protection and base layers approx. 1 310 m
- Passable surfaces made of concrete paving approximately 655m
- Ecoplast about 695 m
- Non-accessible areas of concrete paving approx. 500 m
- Eaves strips approx. 60 m
- Edges made of concrete shelves approx. 602 m;
- steel belt approx. 200 m;
- Earthwork pipeline and cable trenches, incl. Sanding / cable warning tape 378 m incl. Shaft systems;
- Box gutter can be driven over 21 m;
- facade connection channel 14 m (custom-made);
- yard / street drains 15 pieces;
- Aluminum profile clean running mats 3 pieces, aluminum profile mat with steel tub as a special construction at the main entrance;
- Masonry (0.55 x 0.12 x 1 m) 11 m with railings;
- staircase with 10 m block steps;
- Lights 22 pieces of which 11 pieces with socket;
- Deliver and install barrier system 1 pc.
- concrete foundation works;
- Equipment elements: 4 concrete bench seats straight with a wooden pad and a dog leash carabiner, 18 bicycle clamps, 4 bicycle row parkers, 4 signs with posts, 14 bollards (4 fixed, 10 foldable), 2 waste bins including ashtray;
- Deliver and install top floor 240 m
- Loosening of the planting areas by milling 200 m
- Planting area with gravel for perennials 145 m
- Gravel of tree slices vegetation areas 205 m
- Planting of 21 trees including the production of tree pits, anchoring, tree irrigation system;
- planting 626 perennials and 640 bulbs;
- Incl. Completion maintenance trees and shrubs, shrubs;
- Sowing 870 m