The market is divided into 2 lots:
- Lot 1: Acquisition of a road-rail truck for interventions and maintenance operations on the tramway network including study, construction, homologation, delivery and commissioning.
- Lot 2: Acquisition of an estimated number of 2 rail-road trucks for interventions, maintenance operations and logistics (freight transport) on the tramway or metro network including study, construction, homologation, delivery and commissioning. STIB will order a first truck in 2024. The acquisition, after 2024, of a second truck meeting the characteristics of lot 2 is optional
This is a 6-year framework agreement that includes the acquisition, supply of spare parts, diagnostic tools, technical documentation and training for STIB operators and technicians.
Acquisition of a road-rail truck for interventions and maintenance operations on the tramway networkSee section II.1.4) Brief description
Acquisition of an estimated number of 2 road-rail trucks for interventions, maintenance operations and logistics (freight transport) on the tramway or metro networkSee section II.1.4) Brief description