- Cooking block assembly from 5 existing thermal appliances and 4 existing work tables, make Elro built in 2004
- Various block fasteners, panels, center cover, installation channel
- 1 microwave oven
- 17 m work and sink systems
- 1 Nassmüllkühlschrank
- 1 granulate dishwasher
- 1 double-basket pass-through dishwasher with inlet and outlet table
- 5 mobile devices
- 35 m Edelstahlregale
- 28 m2 cold room combination consisting of 5 cold rooms
- Small refrigeration equipment for the supply of 4 plus cold rooms
- Small refrigeration equipment for supplying 1 freezer room
- Dismantling of existing kitchen equipment
- Connection work, commissioning, as-built documentation.
New construction of nursing home meeting center St. Michael
Construction phase 1
Ludwigstrasse 20
93413 Cham, France