This list of services includes the services for the redesign of the planned lawn, meadow and planting areas including new tree planting, the basic expansion of the exhibition / changing pile areas as well as the construction of the wooden deck at the Schwanenteich including the foundation in Kaiser-Wilhelm-Park (eastern area of the processing area) and Lenné Park (western part of the processing area). Landscaping work, planting work as well as steel and wood construction work for the wooden deck are to be carried out for the production of the outdoor facilities.
The following work must be carried out at a glance:
A2 / A4 Kaiser Wilhelm Park and Lenné Park:
- Loosen and store 245 m³ topsoil,
- 730 m³ topsoil seven,
- Remove 650 m³ of soil, load, convey and put on pile,
- 1,300 m³ of soil, stored on site, installed,
- 5 300 m
- 190 m
- 3 350 m
- clear 70 pcs of rootstock,
- 360 m
- 30 wood care / plant pruning, single wood,
- Create 15 m³ pipe trench, depth up to 1.00 m, width up to 0.60 m,
- Create 65 m³ pipe trench, depth up to 0.60 m, width up to 0.30 m,
- 32 m pressure pipe HDPE, PE 100, DA 32,
- 432 m pressure pipeline HDPE, PE 100, DA 40,
- 2 valve boxes made of plastic,
- 12 full and partial circle pop-up sprinklers,
- 13 pcs. Pop-up sprinklers with rotating spray nozzles,
- 21 500 m
- deliver 720 m³ of topsoil,
- Install 1 500 m³ of topsoil 70 m
- Deliver and install 20 cm vegetation base layer for gravel lawns,
- Supply and install 270 m³ of vegetation substrate for perennial areas,
- supply and install 75 m³ of vegetation substrate for rhododendrons,
- 2 070 m
- Planting 149 trees,
- plant 825 pcs of bushes,
- Plant 8 465 perennials, grasses and ground cover,
- 6 607 perennials / aquatic plants,
- Plant 4 692 St. geophytes,
- 10 970 m
- 70 m
- 19 150 m
B11 Renaturation of the mill pond and the swan pond:
- create and dispose of 2 500 m³ of soil removal,
- Create and reinstall 200 m³ of soil removal,
- Delivery and installation of 760 t of hard rock substrate,
- 100 m
- Deliver and move 25 blocks of blocks,
- 400 m
- 374 m
- Deliver and install 271 t of hard rock substrate D 15-20 cm,
- Deliver 87 t of Rheinkies 8/32 gravel fill according to profile, D 20 cm,
- 118 m
- 118 m
- 118 m
- 7 pcs. Weir 120 x 66 cm deliver install 7 make giant pebbles from in-situ concrete including foundation make 4 barrages including reinforcement,
- 7 720 m
- Cut 112 m concrete trough profile Mühlenteich,
- Demolish and dispose of 105 m³ of concrete and masonry,
- 320 m
- Dismantle, store, assemble 2 slide construction
- Pick up and dispose of 40 m wooden fence,
- Pick up and dispose of 95 m of wire mesh fence,
- 1 pc. Demolition and disposal of bridge structure 1,
- 1 pc. Demolition and disposal of bridge structure 2,
- 1 pc. Demolition and disposal of bridge structure 3.
B1.2 wooden deck swan pond:
- deliver and install 22.50 m concrete angle element,
- Delivery and installation of 10 steel web piles, L = 5.50 m,
- Delivery and installation of 6 steel web piles, L = 5.85 m,
- Delivery and installation of 15 steel web piles, L = 6.20 m,
- Deliver and assemble 195 m HEA 160 longitudinal beam for platform,
- Deliver and assemble 27 m secondary beam IPE 140 for platform,
- Deliver and assemble 650 m support layer for platform covering,
- 170 m
- 22 m
- Deliver and assemble 1 pc lifebuoy in the box,
- Deliver and install 60 m³ natural stone-crushed grain mixture approx. 32/80.
Exhibition areas:
- Delivery and installation of 80 m of 4/100 mm steel strip edging,
- 217 m
- Loosen 424 m³ of soil, load, convey and put on pile,
- dig 67 m of plant trench,
- Deliver and install 435 m³ of vegetation substrate 0/16,
- Plant 235 hedge bushes,
- 500 m