1. The four point skyscrapers of Johannes R. Becher Str. 2, 4, 8 and 12 in 07546 Gera, built in 1965, form part of the housing estate “Am Bieblacher Hang”. The “Bieblach Hang” is located in the north of Gera and is one of the first complex planned residential areas after World War II.
The skyscrapers are largely identical. There are four 2-room apartments with kitchen and bathroom on each floor. The elevator is in the middle of the building. Each of the high-rise buildings has a full basement and, in addition to the differently used ground floor (residential and commercial), 9 upper floors and a terrace roof ("lantern"). The "lantern" is an accessible attic with a view over Gera.
The fire protection renovation was carried out in 1995/96 on the basis of the high-rise directive. All apartments were given smoke-tight apartment entrance doors, the electrical installation and the roof were renewed. Before an apartment can be rented out again, it will be completely renovated.
Today around 17% of the residential and commercial units are empty. A renewed renovation is planned to increase the attractiveness of the apartments in the largely originally preserved and popular residential area.
John R. cup str. 2:
Framework:
— tubular steel façade scaffolding, W09 4 786 m
— transport platform for people and materials, delivery height 31.00 m.
Socket of contact earth components:
— plinth plaster 78 m
— plinth work over OK terrain 128 m
Preparation on balcony windows:
— base/perimeter insulation 035 86 m
— balcony facade insulation layer 665 m
— work on soffits 691 m,
— dowel S (STR) — recessed mounting, including dowels 665 m
balcony floor:
— blasting with solid abrasive media, with protective cover,
— balcony floor 327 m
facades profiles silhouette:
— facades profiles mineral as flat profile 1635 m,
— facades profiles mineral as window sill and belt profile 423 m,
— waterproofing with liquid, spreadable sealant 2 058 m.
EDVS system:
— cancel plaster exterior wall 375 m
— high-pressure wet cleaning of the plaster ground 3 759 m
— connection to windows and doors with plastering strip 1226 m,
— edge formation 2406 m,
— facade insulation layer, 035, 60 mm 3 006 m
— reinforcement 3 927 m
— armor of soffits and camber 1 674 m,
— surface plaster, historical scratch plaster 3 759 m
— top coat base 112 m
— finish coat balcony 750 m
— paint façade elements 1 635 m.
John R. cup str. 4:
Framework:
— tubular steel façade scaffolding, W09 4 786 m
— transport platform for people and materials, delivery height 31.00 m.
Socket of contact earth components:
— plinth plaster 78 m
— plinth work over OK terrain 128 m
Preparation on balcony windows:
— base/perimeter insulation 035 86 m
— balcony facade insulation layer 665 m
— work on soffits 691 m,
— dowel S (STR) — recessed mounting, including dowels 665 m
balcony floor:
— blasting with solid abrasive media, with protective cover,
— balcony floor 327 m
facades profiles silhouette:
— facades profiles mineral as flat profile 1 635 m,
— facades profiles mineral as window sill and belt profile 423 m,
— waterproofing with liquid, spreadable sealant 2 058 m.
EDVS system:
— cancel plaster exterior wall 375 m
— high-pressure wet cleaning of the plaster ground 3 759 m
— connection to windows and doors with plastering strip 1226 m,
— edge formation 2406 m,
— facade insulation layer, 035, 60 mm 3 006 m
— reinforcement 3 927 m
— armoring of soffit and camber 1674 m, surface plaster,
— Historical scratch plaster 3 759 m
— top coat base 112 m
— finish coat balcony 750 m
— paint façade elements 1 635 m.