The community of Feldkirchen intends to build a residential complex with lunchtime care, multifunctional room, 2 clusters of senior citizens' homes and an underground car park.
The planning site is located in a residential area that is adjacent to the special use in the east.
In the north, the railway line represents a border with the adjoining industrial park.
The proposed structures encompass a shared courtyard in a relaxed position, which forms the center of the quarter.
Performance dates:
House 1:18.01.2023 — 07.03.2023
House 3 22.09.2022 — 04.11.2022
Start on site: 22.09.2022
Completion: 07.03.2023
Core quantities:
Carpenter fixed fixtures, surface HPL coating
kitchenettes, with floor, upper, tall cabinets,
with fridge, dishwasher, stove, oven, microwave,
floor-to-ceiling, different widths 32 pieces
shelves, with shelves
floor-to-ceiling, different widths 10 pieces
vanity unit, with sink, towel dispenser,
trash bins 2 pcs
Carpenter fixed fixtures, maple veneer surface
benches 6 pieces
cabinets, with shelves, revolving doors,
floor-to-ceiling, different widths 11 pieces
wardrobes, with bench, shelves, compartments,
hooks, clothes rails
floor-to-ceiling, different widths 36 pieces