Product:
100.MN01-1052-01 Innenputzarbeiten BT1
Interior plastering work as part of renovation and renovation measures.
in existing buildings, in hospital facilities. Not too
parts of the building remain in place during the execution of the
active.
approx. 140 m slot/gap filling, cable slots;
approx. 355 m2 of substrate made of coated old plaster cleaning of adhesives
residues, adhering to each other, by sanding followed by
priming for filler work and filling with hydrated
Filler (gypsum filler), synthetic resin coated, fibre-coated
strengthening, filler quality level Q2, full-surface;
approx. 50 m cleaning and filling of old plaster as before, but on
Column and beam, unwinding. 30-60 cm;
approx. 136 m Cleaning and filling of old plaster as before, but on
reveals, W 30 cm;
approx. 70 m subsequent plastering/plastering of built-in parts as well as
cleaning of small areas up to 1 m2 individual area as required;
approx. 1175 m2 thermal insulation layer under underground car park ceiling, mineral
wool MW, application area DI, WLG 035, D 100 mm;