Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 August 2023
Closing Date:
11 September 2023
Location(s):
PL824 Tarnobrzeski (PL Poland/POLSKA)
Description:
Post-consolidation development of villages: Opaleniska, Zmysłówka, Laszczyny, Chodaczów

The subject of the contract is the execution of construction works related to

with post-consolidation development on the task: Post-consolidation development of villages: Opaleniska, Zmysłówka, Laszczyny, Chodaczów as part of the measure "Support for investments related to the development, modernization and adaptation of agriculture

and forestry" covered by the Rural Development Programme for 2014-2020".

A detailed description of the subject of the contract is the design documentation, technical specification for the execution and acceptance of construction works with bills of quantities constituting annexes to the Terms of Reference.

Post-consolidation development of the village of Opaleniska - short name, due to the limit of the number of characters, the full name of part No. 1 can be found in the description of the subject of the contract point II.2.4) of this announcement

Task name part no. 1: Post-consolidation development on the task: "Construction and reconstruction of post-consolidation roads with culverts under roads and exits to plots, renovation of drainage ditches and land reclamation" for the project: Land consolidation of the village of Opaleniska, Grodzisko Dolne commune

The scope of works includes, among others:

construction or reconstruction of access roads to agricultural and forest land and access roads to the buildings of individual participants of the merge,

correction of the course and improvement of technical parameters of water drainage devices or other water devices,

elimination of unnecessary copper and roads and performing reclamation treatments enabling mechanical cultivation of land.

A detailed description of the subject of the contract is the design documentation, technical specification for the execution and acceptance of construction works with bills of quantities constituting annexes to the Terms of Reference.

The Contracting Authority recommends conducting a site inspection in order for the Contractor to familiarize itself with the actual conditions for the execution of construction works (i.e. to learn about possible problems and difficulties related to the future implementation of the subject of the contract). Vision is not mandatory.

The contracting authority requires the lodging of a performance bond - detailed information is contained in point 19 SWZ.

Pursuant to Article 95(1) of the PPL, the Contracting Authority requires the Contractor, subcontractor or further subcontractor, on the basis of an employment relationship, to employ persons performing all activities in the field of performance of the contract in the manner specified in Article 22 § 1 of the Act of 26 June 1974 – Labour Code. This requirement applies to persons who perform activities directly related to the performance of specific physical works related to the performance of works in the field of site preparation for construction and earthworks, road, reclamation and drainage works (so-called physical workers) - detailed information is contained in point 3.6 of the SWZ.

Information on GDPR is contained in point 24 SWZ.

Post-consolidation development of the village of Zmysłówka - abbreviated name, due to the limit of the number of characters, the full name of part no. 2 can be found in the description of the subject of the contract point II.2.4) of this announcement

Task name part no. 2: Post-consolidation development on the task: "Construction and reconstruction of post-consolidation roads with culverts under roads and exits to plots, renovation of drainage ditches and land reclamation" for the project: Land consolidation of the village of Zmysłówka, Grodzisko Dolne commune

The scope of works includes, among others:

construction or reconstruction of access roads to agricultural and forest land and access roads to the buildings of individual participants of the merge,

correction of the course and improvement of technical parameters of water drainage devices or other water devices,

elimination of unnecessary copper and roads and performing reclamation treatments enabling mechanical cultivation of land.

A detailed description of the subject of the contract is the design documentation, technical specification for the execution and acceptance of construction works with bills of quantities constituting annexes to the Terms of Reference. The contracting authority recommends carrying out an on-site inspection,

in order for the Contractor to familiarize himself with the actual conditions for the execution of construction works (i.e. to learn about possible problems and difficulties related to the future implementation of the subject of the contract). Vision is not mandatory.

The contracting authority requires the lodging of a performance bond - detailed information is contained in point 19 SWZ.

Pursuant to Article 95(1) of the PPL, the Contracting Authority requires the Contractor, subcontractor or further subcontractor, on the basis of an employment relationship, to employ persons performing all activities in the field of performance of the contract in the manner specified in Article 22 § 1 of the Act of 26 June 1974 – Labour Code. This requirement applies to persons who perform activities directly related to the performance of specific physical works related to the performance of works in the field of site preparation for construction and earthworks, road, reclamation and drainage works (so-called physical workers) - detailed information is contained in point 3.6 of the SWZ.

Information on GDPR is contained in point 24 SWZ.

Post-consolidation development of the village of Laszczyny - abbreviated name, due to the limit of the number of characters, the full name of part no. 3 can be found in the description of the subject of the contract point II.2.4) of this announcement

Task name part no. 3: Post-consolidation development on the task: "Construction and reconstruction of post-consolidation roads with culverts under roads and exits to plots, renovation of drainage ditches and land reclamation" for the project: Land consolidation of the village of Laszczyny, Grodzisko Dolne commune

The scope of works includes, among others:

construction or reconstruction of access roads to agricultural and forest land and access roads to the buildings of individual participants of the merge,

correction of the course and improvement of technical parameters of water drainage devices or other water devices,

elimination of unnecessary copper and roads and performing reclamation treatments enabling mechanical cultivation of land.

A detailed description of the subject of the contract is the design documentation, technical specification for the execution and acceptance of construction works with bills of quantities constituting annexes to the Terms of Reference. The contracting authority recommends carrying out an on-site inspection,

in order for the Contractor to familiarize himself with the actual conditions for the execution of construction works (i.e. to learn about possible problems and difficulties related to the future implementation of the subject of the contract). Vision is not mandatory.

The contracting authority requires the lodging of a performance bond - detailed information is contained in point 19 SWZ.

Pursuant to Article 95(1) of the PPL, the Contracting Authority requires the Contractor, subcontractor or further subcontractor, on the basis of an employment relationship, to employ persons performing all activities in the field of performance of the contract in the manner specified in Article 22 § 1 of the Act of 26 June 1974 – Labour Code. This requirement applies to persons who perform activities directly related to the performance of specific physical works related to the performance of works in the field of site preparation for construction and earthworks, road, reclamation and drainage works (so-called physical workers) - detailed information is contained in point 3.6 of the SWZ.

Information on GDPR is contained in point 24 SWZ.

Post-consolidation development of the village of Chodaczów - short name, due to the limit of the number of characters, the full name of part no. 4 can be found in the description of the subject of the contract point II.2.4) of this announcement

Task name part No. 4: Post-consolidation development on the task: "Construction and reconstruction of post-consolidation roads with culverts under roads and exits to plots, renovation of drainage ditches and land reclamation" for the project: Land consolidation of the village of Chodaczów, municipality of Grodzisko Dolne

The scope of works includes, among others:

construction or reconstruction of access roads to agricultural and forest land and access roads to the buildings of individual participants of the merge,

correction of the course and improvement of technical parameters of water drainage devices or other water devices,

elimination of unnecessary copper and roads and performing reclamation treatments enabling mechanical cultivation of land.

A detailed description of the subject of the contract is the design documentation, technical specification for the execution and acceptance of construction works with bills of quantities constituting annexes to the Terms of Reference. The contracting authority recommends carrying out an on-site inspection,

in order for the Contractor to familiarize himself with the actual conditions for the execution of construction works (i.e. to learn about possible problems and difficulties related to the future implementation of the subject of the contract). Vision is not mandatory.

The contracting authority requires the lodging of a performance bond - detailed information is contained in point 19 SWZ.

Pursuant to Article 95(1) of the PPL, the Contracting Authority requires the Contractor, subcontractor or further subcontractor, on the basis of an employment relationship, to employ persons performing all activities in the field of performance of the contract in the manner specified in Article 22 § 1 of the Act of 26 June 1974 – Labour Code. This requirement applies to persons who perform activities directly related to the performance of specific physical works related to the performance of works in the field of site preparation for construction and earthworks, road, reclamation and drainage works (so-called physical workers) - detailed information is contained in point 3.6 of the SWZ.

Information on GDPR is contained in point 24 SWZ.

Download full details as .pdf
The Buyer:
POWIAT LEŻAJSKI
CPV Code(s):
45000000 - Construction work
45111200 - Site preparation and clearance work
45112330 - Site-reclamation work
45233123 - Secondary road construction work
45233220 - Surface work for roads