Trade 1180-03 Roof waterproofing work roof over surgical functional area (CFB)
- Renovation of the flat roof waterproofing approx. 550m2 Break off and dispose of roof waterproofing including insulation and waterproofing membrane
- Reconstruction of the roof waterproofing incl. slope insulation and waterproofing membranes approx. 550m² incl. all connection work