The cath. Hospital Hagen in accordance with GmbH intends to close Elsey Hospital with its somatic departments of surgery, internal medicine, ENT and gynecology and to convert it into a specialist clinic for psychiatry and psychotherapy. The aim is to merge the psychiatric department of Hagen Hospital with the existing psychiatry at the Elsey site. To implement this measure, considerable replanning and conversion measures are required. Various construction services are to be advertised and awarded for this purpose.
The measure described is carried out with funds from the hospital structure fund according to §§ 1ff. Hospital Financing Act (KHG) funded.
The existing Elsey hospital is to be converted into a specialist clinic for psychiatry and psychotherapy. For this purpose, the existing building is to be subjected to considerable conversion measures. Since this is a conversion during ongoing operation, this is expected to be carried out in three construction phases. The conversion work began in January 2022 and is expected to be completed by November 2025.
The tendered services in 3 lots and construction phases are the electrotechnical installation.
In a psychiatric institution with the construction of 14 sub-distributions, approx. 2,600 m cable platform, 111,000 m cables and wires,
81,500 m of low-voltage power lines, emergency lighting, fire alarm system, satellite antenna system, data and network technology.
The installation takes place during ongoing operation of the facility and must be calculated accordingly.
Details of the service advertised can be found in the list of services.