A 114, km 1-8, renewal including ramps of the junctions in the district of Pankow, compensatory and replacement measures MP 3 measure close to the route
approx. 161 pieces Delivery and planting of tall trunks, H 3 x v, StU 10-12 m.B., incl. soil improvers, tree anchoring, mulching slice, bark protection, collision protection
approx. 4,520 pieces Supply and planting of shrubs and heisters, incl. soil improvers, stakes, planting discs Mulching
approx. 6,390 m² Supply and planting of shrubs on embankments (inclination up to 1:1.5), incl. soil improvers, planting discs Mulching
approx. 190 m³Transporting, sampling and disposing of soil
approx. 1,155 m² spraying greening with a native seed mixture, embankment
approx. 2,675 m²Sowing with a native seed mixture
approx. 75 m of search shafts to determine the location of underground supply and disposal pipelines
Approx. 225 m install root barrier along paths
approx. 255 m fence construction (bite and chain-link fence), installation of gate in wildlife protection fence approx. 161 pieces of tall trunks; 1 year completion and 3 years development maintenance
maintain approx. 11,050 m² of woody area; 1 year completion and 3 years development maintenance
maintain approx. 11,390 m² of woody area (embankment); 1 year completion and 3 years development maintenance
approx. 11.965 m² Böschungsmahd (4 Pflegejahre)
approx. 8,125 m² mowing work, flat (4 years of maintenance)
approx. 600 tons of soil to be loosened, conveyed, disposed of according to the profile
Supplying and installing approx. 50 m³ of soil
approx. 1 piece of debris sampling
Create approx. 160 m² of traffic area for rural paths, incl. edging
Install approx. 55 gabion baskets (terrain interception), incl. static calculation
Manufacture stairs (block steps) including railings
Deliver and install approx. 4 pieces of equipment elements (benches, bollards)
Produce approx. 100 m² of gravel lawn
make approx. 8 m pavement edging