Building construction work | Tenderlake

Building construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 June 2019
Closing Date:
22 July 2019
Location(s):
BE241 Arr. Halle-Vilvoorde (BE Belgium/BELGIQUE-BELGIË)
Description:
Company of general construction, interior design and standard techniques (electricity, HVAC, ...) in a silver processing building

The general economic operator will take care of the construction (structural work and finishing eg doors, gates, locks, ...), the layout (eg offices, meeting rooms, restaurant,. ..), the installation of standard techniques such as electricity (HV, LV, back-up power, UPS, lighting, motive power, low current and data wiring, ...), HVAC ( for offices, a restaurant with kitchen, work areas and with a TIER III cooling of 2 small data rooms) and the development of perimeter, green areas and parking.

The general economic operator is not only responsible for the content and technical coordination and integration of all disciplines within his mission, but also the coordination and integration of all other special techniques or deliveries ( explosion-proof doors, automation techniques, active security, etc.) commissioned by the Bank.

As part of a sustainable operation, a geothermal and a large surface of solar panels will be provided. The general economic operator will not only be responsible for the construction, but will also be responsible for the operation of the building and facilities for 8 years. Very high availability of some facilities will be required. The provisional acceptance of the building and facilities is scheduled for mid-2022.

The general economic operator will take care of the construction (structural work and finishing eg doors, gates, locks, ...), the layout (eg offices, meeting rooms, restaurant,. ..), the installation of standard techniques such as electricity (HV, LV, back-up power, UPS, lighting, motive power, low current and data wiring, ...), HVAC ( for offices, a restaurant with kitchen, work areas and with a TIER III cooling of 2 small data rooms) and the development of perimeter, green areas and parking.

The general economic operator is not only responsible for the content and technical coordination and integration of all disciplines within his mission, but also the coordination and integration of all other special techniques or deliveries ( explosion-proof doors, automation techniques, active security, etc.) commissioned by the Bank.

As part of a sustainable operation, a geothermal and a large surface of solar panels will be provided. The general economic operator will not only be responsible for the construction, but will also be responsible for the operation of the building and facilities for 8 years. Very high availability of some facilities will be required. The provisional acceptance of the building and facilities is scheduled for mid-2022.

Download full details as .pdf
The Buyer:
Nationale Bank van Belgie
CPV Code(s):
45210000 - Building construction work