Execution of construction works for the investment entitled:
"Improvement of traffic safety through the extension of Klonowa, Orląt Lwowskich and J. Piłsudskiego streets and intersections of Batalionów Chłopskich with Malików, Bp. M. Jaworskiego with G. Zapolska in Kielce"
Part 2: "Extension of the intersection of Bp. M. Jaworskiego Street with J. Piłsudskiego Street and G. Zapolska Street in Kielce"
Part 4: "Extension of Orląt Lwowskich Street and Piłsudskiego Street in Kielce, total length of approx. 480 m"
Construction works for the above-mentioned investments include, among others:
1) Part 2: "Extension of the intersection of Bp. M. Jaworskiego Street with J. Piłsudskiego Street and G. Zapolska Street in Kielce":
a) extension of the intersection of BPA Street. M. Jaworskiego from Marszałka J. Piłsudskiego Street and G. Zapolska Street,
b) reconstruction and construction of sidewalks with a width of 1.50 – 2.00 m,
c) reconstruction and construction of bicycle paths with a width of 1.50 – 2.50 m,
d) construction of traffic lights,
e) reconstruction of road drainage,
f) construction and reconstruction of street lighting,
g) construction of a technological channel,
h) reconstruction / protection of conflicting utilities networks and technical infrastructure,
i) implementation of road markings and road safety devices,
j) felling of conflicting trees and shrubs,
k) demolition of elements colliding with the planned investment,
l) replanting greenery,
2) Section 4: "Extension of Orląt Lwowskich Street and Piłsudskiego Street in Kielce, total length of approx. 480 m":
a) extension of the roadway of Marszałka J. Piłsudskiego Street on the section from the intersection with Orląt Lwowskich Street (KM 0+000) to the entrance to block No. 78 housing estate "Na Stoku " (KM 0-192.75),
b) extension of the roadway of Orląt Lwowskich Street on the section from the intersection with J. Marszałka Piłsudskiego Street (KM 0+000) to block No. 69 "Na Stoku" housing estate (KM 0+281.23),
c) construction of a bicycle lane from KM 0-192.75 to KM 0-019,
d) construction and extension of parking spaces,
e) construction and extension of sidewalks,
f) palisade settings,
g) construction of handrails,
h) construction of terrain stairs made of cubes,
i) reconstruction of public and individual conventions,
j) reconstruction of the existing bus stop on the roadway,
k) cutting down greenery colliding with the investment,
l) replanting greenery,
m) reconstruction of road drainage,
n) construction and reconstruction of street lighting,
o) reconstruction / protection of existing utilities networks (m.in. power grid, teletechnical, gas, water supply network, heating network),
p) implementation of vertical and horizontal markings and BRD equipment.