This consultation concerns the construction of a solidarity pole in the municipality of Ile d'Yeu, hosting a CCAS, a multi-reception, a relay room for the food bank, an MDSF, an MSP, the admr. The service will include all the issues inherent to an island construction: transport of equipment, goods, accommodation, etc.
Various network roadsthe construction of a solidarity pole in the commune of the Ile d'Yeu, hosting a CCAS, a multi-reception, a relay room for the food bank, an MDSF, an MSP, the admr. It has 15 lots
CleaningCleaning concerns:
A - floors - tiles: Vacuuming, leaching, scraping joints, removal of all traces of glue or coating.
Flexible floors: Vacuuming, leaching, removal of all traces of glue or coating.
Painting - dust removal, leaching if necessary
B - Walls:
Paint:
-dusting.
Wood cladding:
- suction, dusting. Wash if necessary.
Tiled baseboards:
- suction, leaching, scraping of joints, removal of all traces of glue or coating.
Wooden baseboards:
- suction, dusting. Wash if necessary.
C - joinery:
Interiors - doors (2 sides) - frames - closet facades - chest - ducts - closet layout - hardware, mirrors:
- dust removal - washing if necessary.
Exterior - windows, French doors on 2 sides - glazed facades:
- impeccable cleaning of the glazing.
- Washing of frames and frames - supports and thresholds - removal of all traces of glue and coatings.
- Aspiration of grooves, scraping, washing, removal of all traces of coating.
D - sanitary facilities:
All appliances including accessories (taps, shower, shower screens, lid, sink cabinet, etc.):
- dusting, washing, removal of all traces of glue and coating, drying.
E - pipes:
All apparent pipes:
- dusting, washing, removal of all traces of glue and coating.
F- electrical equipment:
All equipment (sockets, switches, wall lamps, doorbell, board, etc ...):
- dusting, washing if necessary.
G- elevator:
Interior cabin and platform screen doors
Electricity CFO CFAAs part of this operation, the work to be carried out by this lot will include:
- part of the site installations according to the recommendations of the CCTC,
- the supply of low-voltage electrical energy from the Enedis electricity network,
- the main electrical panel (Tgbt),
- Electrical Divisional Panels,
- paths, cable trays, ...
- miscellaneous power supplies,
- control devices,
- normal lighting (indoor/outdoor),
- emergency lighting,
- overvoltage protection,
- the land network,
- charging stations for electric vehicles,
1.4.2 For the electricity part low currents
- telephone / computer distribution (Vdi pre-cabling),
- vidéophonie,
- access control
- intrusion alarm,
- time distribution,
- Technical Building Management
- Fire alarm equipment
Heating ventilation plumbing sanitary (HVAC PBS)The Establishment is classified as an Establishment open to the public (E.R.P.).
The building of 3 levels will be composed of a nursery, an administration part (offices, meeting rooms, rest room)
DrillingDrilling facilities will include:
Realization of a drilling campaign
Installations of geothermal probes and collectors up to the outlet in the technical room
ElevatorThe work to be carried out includes the installation of:
- lift 630 kg accessible PMR double access, with reduced height under slab
Green spacesGreen space development work
Big workthe work will include:
Additional earthworks,
Underground networks,
Infrastructure,
Superstructure,
Miscellaneous works,
Finishes
frame Timber frame Ravalementthe work will include:
The timber frame roof support,
The walls frame wood cladding support,
The walls frame wood support of plaster,
The walls frame wood of slitting,
The intermediate floor in CLT including frame post-beam support,
The technical wooden floor in attic including safety guardrail,
Wood cladding including wood thorns,
The façade facelift (ETICS on wood and concrete sails)
Tile coverRoofing work includes:
studies, slope plans and details and calculations of stormwater drainage works
the supply and installation of materials, wooden supports, cushioning furs, ridge and ridge parts, various seals, ..
the execution, all supplies included, of connecting works on masonry (flashing, ruellées, caulking, shapes)
supply, shaping and installation of flashing trim
the supply and installation of special elements for the ventilation of attics and roof undersides
the supply and installation of evacuation works from E.P to the connections specified in the C.C.T.P
the supply and installation of safety works for the subsequent maintenance of the works
exterior carpentry locksmithFrom the beginning of the work, the company will draw up the execution plans of the joinery.
These plans will indicate in particular the dimensions of the structures, the connections with the framework (joints, cladding, etc.).
Reservations and fastenings to be provided with the necessary calculation notes, the principle of fixing the glazing and all the details concerning the ancillary works (roller shutter, shutters, railings, lining partitions ...).
Metal joinery is composed from extruded profiles made of aluminum alloy, first category. The profiles must ensure the recovery and evacuation of condensate. In striking openings, the system must always have a double beat. The dormant and opening profiles have lip seal housings ensuring perfect airtightness and water tightness.
Light alloy profiles and hardware are anodized according to the requirements of the international standards EWAAEURAS: Class 20 (in the case of aggressive or marine atmosphere). Chemical satin finish.
The profiles can also be made in lacquered finish. The profiles undergo surface preparation before lacquering consisting of degreasing, de-rocking and chromating.
After drying, a polyester powder coating is applied and polymerized.
Lacquered aluminium profiles must be certified by the supplier and the lacquerer confirming that the quality of the metal and the surface finish are compatible with the use of the vessel, exposure to sea spray.
The lacquering must be the subject of the Qualicoat label with a particular specification attesting to the use of carpentry by the sea. (in a chlorinated atmosphere and high humidity).
For all the works of this lot, provide a label Label Qualicoat, Qualanod, marine quality for all works
False ceiling lining partitionsThe work due under this lot will include:
- cleaning of floors for tracing,
- the implantation of partitions,
- verification of the installation of frames and frames laid forward by the carpenter,
- the installation of hatches,
- caulking of frames and buildings,
- the supply and installation of PVC soles or resilient materials,
- the supply and installation of partitions and ceilings, including perforated metal profiles, reinforced edge strips, corner strips, treatment of edges and pickings, installation of any taligots,
- the supply of scaffolding, its installation and removal,
- all the fastenings necessary for connections to structures,
- the identification of the descents and exits of the electricity lot,
- metal or wood parts and reinforcements necessary for fastening works of other trades (plumbing, electricity, carpentry, locksmithing),
- sponge cleaning of all joinery, scraping of the concrete slab, careful cleaning of the premises after intervention and removal of gravois at landfills
Interior joineryCarpentry work
FLOOR COVERINGSFloor and wall coverings
PaintingPaint work