A thorough renovation is planned for the B236 in Dortmund from km 5.775 to km 7.600.
The planning includes the following parts:
1. Complete renewal of the asphalt base and surface layers as well as the frost protection layer with improvement of the axis, gradients and lane widths in both directions of travel,
2. Renewal and / or repair of road drainage (maintenance),
3. New construction of rainwater treatment systems,
4. complete renewal of the protective devices,
5. Replacement new construction of the signposting (VZ boom),
6. Replacement construction of 3 deficit bridge structures in the course of the B236 over Baukampstraße, Kirchderner Graben and Derner Straße,
7. Noise technology with improvement of noise protection through replacement new buildings LS walls and / or repairs,
8. Construction phase planning and traffic management for the overall measure,
9. SiGeKo.
A thorough renovation is planned for the B236 in Dortmund from km 5.775 to km 7.600.
The planning includes the following parts:
1. Complete renewal of the asphalt base and surface layers as well as the frost protection layer with improvement of the axes, gradients and lane widths in both directions of travel,
2. Renewal and / or repair of road drainage (maintenance),
3. New construction of rainwater treatment systems,
4. complete renewal of the protective devices,
5. Replacement new construction of the signposting (VZ boom),
6. Replacement construction of 3 deficit bridge structures in the course of the B236 over Baukampstraße, Kirchderner Graben and Derner Straße,
7. Noise technology with improvement of noise protection through replacement new buildings LS walls and / or repairs,
8. Construction phase planning and traffic management for the overall measure,
9. SiGeKo.