The planned measure includes the construction of a new multifunctional house for youth and family in Kitzingen.
The tender covers the electrical work.
-Construction of a GHV and a sub-distributor
-Construction of a PV system with battery storage with approx. 25kWp – divided on two separate roof areas
-Laying of cables/wires mainly via cable tray/duct, collector holder or pipe and underfloor duct
ca. 6.500 m Installationsleitung NYM-J 1x6mm²/ 3x1,5mm² – 7x1,5mm²
approx. 250 m Gummischlauchleitung
approx. 600 m data cable 4x2xAWG23
approx. 1,700 m data cable 2x(4x2xAWG23)
approx. 150 m cable tray W/H 100/60mm – 500/60mm
ca. 350 St: Installationsgeräte
approx. 320 pcs: Luminaires
-Installation of emergency lighting (single battery)
-Establishment of a radio-based internal home alarm
-Construction of an intercom system with two indoor stations
-Handicapped accessible installation