High school restructuring work on the Vigan Braquet and Blum sites - building D and building A part.
Asbestos removal, demolition and structural work
Interior wall painting
Heating, ventilation, air conditioning, CTA (networks and equipment) as well as plumbing works.
Work of strong and weak currents of the buildings concerned by the project of rehabilitation and construction, SSI of the whole school.
Supply and installation of an elevator in building A.
Road works, underground networks, outdoor lighting, green spaces, plantations.
Supply and installation of professional catering equipment in the cafeteria of the A.
Painting and plastering on the new building D
Framing and covering the courtyard and other external elements, various metal framework.
Terrace roof waterproofing works for new building D.
Guardrails, ventilation grilles, doors, turnstiles and steel gates.
Supply and installation of the exterior aluminum joinery of the new building D and part of the ground floor of the existing building A.
Interior wood doors and joinery, wall cladding
Duplicating works, plaster partitions, removable false ceiling and plaster.
Laying of porcelain tiles, earthenware and soft floors