Winter service on urban developed and undeveloped land.
Dornholzhausen & KirdorfThe service is scheduled to be provided from November to March.
In the event of snowfall and frosty weather, there is an obligation to clear and gritting on all days from 7:00 a.m. to 8:00 p.m. and beyond if significant pedestrian traffic is to be expected in individual cases due to special circumstances outside this period.
During the above-mentioned periods, the surfaces must be cleared immediately or existing slippery surfaces must be removed. These measures must be repeated after renewed snowfall or slippery conditions.
In individual cases, a response time of no more than one hour after a separate order by telephone or electronic order is required.
Total: 7,406.24 m²
- Kita Dornholzhausen: 465.52 m²
- Nativity scene Dornholzhausen: 87.42 m²
- Gothic House: 2,354.91 m²
- Walkway: 241.44 m²
- Peter-Schall-Haus: 261.52 m²
- Supervision Dornholzhausen: 187.03 m²
- Walkway allotments: 652.22 m²
- Hort/JUZ Top Gardens: 446.91 m²
- Crib Supreme Gardens: 8.23 m²
- BGH Kirdorf: 1.009,00 m²
- House: 30.08 m²
- Obdachlosenunterkunft: 858,17 m²
- Kirdorf fire station: 102.11 m²
- Northwest Sports Centre: 368.64 m²
- Dornholzhausen fire station: 293.77 m²
-Kita Dornholzhausen: 39.27 m²
DowntownThe service is scheduled to be provided from November to March.
In the event of snowfall and frosty weather, there is an obligation to clear and gritting on all days from 7:00 a.m. to 8:00 p.m. and beyond if significant pedestrian traffic is to be expected in individual cases due to special circumstances outside this period.
During the above-mentioned periods, the surfaces must be cleared immediately or existing slippery surfaces must be removed. These measures must be repeated after renewed snowfall or slippery conditions.
In individual cases, a response time of no more than one hour after a separate order by telephone or electronic order is required.
Total: 4,063.70 m²
- Kita Brandenburger: 396.33 m²
- Kita Hausmannspark: 157.42 m²
- Hort Schlossgarten: 217.48 m²
- Registry office: 436.61 m²
- Hort Schulberg: 4.89 m²
- VHS: 132.27 m²
- Bad Homburg fire station: 230.17 m²
- Nativity scene Am Heuchelbach: 374.95 m²
- Hort /SFZ Am Heuchelbach: 174.42 m²
- Kita Engelsgasse: 83.73 m²
- Playground Gluckensteinweg 3: 108.53 m²
- Kita Gartenfeld: 272.70 m²
- SFZ Gartenfeld: 111.69 m²
- Villa Wertheimber: 1.311,59 m²
- Residential/commercial building Kaiser-Friedrich-Promenade 3: 50.92 m²
Downtown & GonzenheimThe service is scheduled to be provided from November to March.
In the event of snowfall and frosty weather, there is an obligation to clear and gritting on all days from 7:00 a.m. to 8:00 p.m. and beyond if significant pedestrian traffic is to be expected in individual cases due to special circumstances outside this period.
Exceptions are the properties Kurzhausvorplatz, Marktplatz and Waisenhausplatz. In this case, the areas are only to be cleared on market days on Tuesdays and Fridays, but this must be done by 06:00 a.m. In the period from mid-November to the beginning of December, the market will be moved from the public squares to Louisenstraße, so that these alternative areas will be affected by the clearing and gritting obligation.
During the above-mentioned periods, the surfaces must be cleared immediately or existing slippery surfaces must be removed. These measures must be repeated after renewed snowfall or slippery conditions.
In individual cases, a response time of no more than one hour after a separate order by telephone or electronic order is required.
Total: 8,573.94 m²
- Technical Town Hall: 4,209.92 m²
- Haberweg 12 a-m: 128.45 m²
- Clubhouse Gonzenheim: 209.95 m²
- Kita Am Seeberg 4: 72.80 m²
- Kita Am Seeberg 6: 54.30 m²
- Spiel- und Lernstube Feldstr.: 80,53 m²
- Social housing Feldstr. 93-97: 164.89 m²
- House Auf der Schanze: 54.16 m²
- Kurhausvorplatz: 1.308,77 m²
- Market Square: 650.63 m²
- Waisenhausplatz: 628,80 m²
- City Library: 94.63 m²
- Storage room Dorotheenstr.: 120,98 m²
- Dorotheenstrasse undeveloped: 260.88 m²
- House Erlenweg 33-35: 99.45 m²
- Water tower at the station: 434.80 m²
Ober-Eschbach and Ober-ErlenbachThe service is scheduled to be provided from November to March.
In the event of snowfall and frosty weather, there is an obligation to clear and gritting on all days from 7:00 a.m. to 8:00 p.m. and beyond if significant pedestrian traffic is to be expected in individual cases due to special circumstances outside this period.
During the above-mentioned periods, the surfaces must be cleared immediately or existing slippery surfaces must be removed. These measures must be repeated after renewed snowfall or slippery conditions.
In individual cases, a response time of no more than one hour after a separate order by telephone or electronic order is required.
Total: 3,443.21 m²
- Kita Leimenkaut: 134.58 m²
- Other Hessengärten: 356.33 m²
- Kita Ober-Eschbach: 184.54 m²
- Kita Ober-Erlenbach: 290.47 m²
- JUZ Ober-Eschbach: 191,00 m²
- Supervision Ober-Erlenbach:76.69 m²
- Albin-Göhring-Halle: 223.97 m²
- Old Town Hall Ober-Eschbach: 92.83 m²
- Clubhouse Ober-Eschbach: 151.20 m²
- FW Ober-Eschbach: 250.36 m²
- At the old town hall Ober-Erlenbach: 229.17 m²
- Wingerthalle: 751,58 m²
- Steinmühlstr. undeveloped: 86.69 m²
- Erlenbachhalle: 239,58 m²
- Ober-Erlenbach fire station: 184.22 m²