The construction project "Extension of the Caspar-Voght-Schule Rellingen (CVE)" is the construction of another school building to the existing buildings of the primary and community school Rellingen. The school's property is located at Schulweg 2 in 25462 Rellingen in the state of Schleswig-Holstein. The planned school building is to be erected with a floor area of approx. 756 m2. It consists of three floors (ground floor, 1st and 2nd floor) and has no basement. The maximum building dimensions of the rectangular structure are approx. 42 x 18 x 12 m in length x width x height.
approx. 35 interior window sills made of chipboard, melamine-coated in different lengths up to approx. 3.5 m,
approx. 45 pieces of wall absorbers in individual areas, up to approx. 7 m2 single size,
3 pieces of wall/niche cladding made of HPL compact panels, up to approx. 6 m2 single size,
a kitchenette consisting of built-in cupboards with appliances, total width approx. 6.50 m,
Two system-specific room cells/boxes as self-contained workstations