Connection of the Maillon Biterrois to the existing “High Service” network of the ORB system, with pipes with a diameter of 1000 mm over a length of approximately 5.6 km.
Construction of a raw water pipe of DN 1000 diameter and associated structures over a total length of 5.590 km divided into two sectors:
- sector 1 on the right bank of the ORB, in the town of Cazouls-lès-Béziers, with a length of 2,035 km of DN 1000 pipes;
- sector 2 on the left bank of the ORB, in the municipalities of Murviel-lès-Béziers and Thézan-lès-Béziers with a length of 3,555 km of DN 1000 pipes, as well as the construction of two horizontal boreholes in DN 1400 mm for crossing the RD 16 and the RD 19.